Designs

 

We have a preliminary design made on Solidworks which will be improved and updated in due course. Matthew is producing a presentation to be shown to the representative from EWB coming in next week. We hope to finalise our design and costing within the next 2 weeks and then start on creating a instruction manual.

The 2 designs we have in mind both have the same basic digester designs but differ with the storage of the gas either storing within the inner tubes of vehicle tires or within another tank/ARTI design.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s